Group Profile
The plant was commissioned for Iron Making by Blast Furnaceand in 2004, steel-making by Electrical Arc Furnace was added. The Rolling Mills was inaugurated in 2009. The Steel Plant is equipped with a 15 km long internal railway siding and five captive power plants, which produce about 60 MW/day.
