Sargent & Lundy Publishes CO2 Capture Pre-Feasibility Study
August 15, 2019 — Sargent & Lundy released a pre-feasibility study commissioned by Enchant Energy to evaluate the technical feasibility and high-level cost of installing amine-based CO 2 capture technology at the San Juan Generating Station (SJGS) for use in enhanced oil recovery (EOR).. The SJGS facility is a nominal 847‑MW-net coal-fired …
